Difference between revisions of "Porting Earth system models to triolith"

From SNIC Documentation
Jump to: navigation, search
(Created page with "{{project info |description=Port three commonly used Earth system models to triolith. |fields=Climate research |financing=SeRC |active=No |start date=2013-02-01 |end date=2012-03...")
 
Line 8: Line 8:
 
}}
 
}}
  
The goal of this project was to port three commonly used Earth system models (EC-Earth 3, CESM1.1 and NorESM) to the triolith cluster at NSC. All the required configuration scripts were generated and typical model configurations were tested for functionality and load balancing. A low resolution (T159L62) version of EC-Earth 3 was also set up and tested.
+
The goal of this project was to port three commonly used Earth system models ([[EC-Earth]], [[CESM1]] and [[NorESM]]) to the triolith cluster at NSC. All the required configuration scripts were generated and typical model configurations were tested for functionality and load balancing. A low resolution (T159L62) version of EC-Earth 3 was also set up and tested.
  
 
== Members ==
 
== Members ==

Revision as of 09:27, 22 April 2013

Name Porting Earth system models to triolith
Description Port three commonly used Earth system models to triolith.
Project financing   SeRC
Is active No
Start date 2013-02-01
End date 2012-03-31

The goal of this project was to port three commonly used Earth system models (EC-Earth, CESM1 and NorESM) to the triolith cluster at NSC. All the required configuration scripts were generated and typical model configurations were tested for functionality and load balancing. A low resolution (T159L62) version of EC-Earth 3 was also set up and tested.

Members

 CentreRoleField
Hamish Struthers (NSC)NSCApplication expertClimate research